The use permit is the evidence that the building as built was inspected, and a buyer of a new apartment should see it before handover.
Buildings completed under the 2017 Law on Spatial Planning and Construction of Structures may have no use permit at all. That law kept use permits for complex engineering structures and let ordinary buildings be used once registered in the cadastre, on the strength of the supervising engineer's final report. For those buildings, ask for the final report and check that the building and its flats are registered.
For a new building, put the use permit, or the date by which the developer must obtain it, in your sale and purchase agreement, and do not accept handover or pay the final instalment without it. You can be registered as owner of a flat only once the flat exists in the cadastre as a separate part of a building. See the off-plan buying process.



